Forest Railway of Vychylovka

Slovakia



The railway uses switchbacks to overcome the local steep inclination and the altitude difference of 217 metres (711.94 feet). It began to operate in 1926 after two separate forest railways were connected - the Kysuce railway running from Oščadnica to Chmúra and the Orava railway running from Lokca to Erdútka, which gave rise to the connecting railway Chmúra - Erdútka.

Both railways with a gauge of 760 mm (29.92 in), which were constructed between 1915 and 1918, were used for transport of timber. The original track was 61 km (38.13 mi) long. The length of the railway track including all turnoffs amounted to more than 110 kilometres. The railway was used until 1971. The whole railway, except for an 8 km (5 mi) long stretch, was dismantled in 1972.

The 3.4 km (2.13 mi) long stretch from a settlement called Kubátkovia to the first switchback, which has been in operation since 1994, lures many tourists. It passes through the area of the Museum of the Kysuce Village, which displays 34 buildings presenting folk architecture from various corners of the Kysuce region.

Top Things To Do in Slovakia

See All →

Trusted local guides, read by millions every month

  • 26.2M page views a month across the network
  • 180+ destination guides worldwide
  • 2006 online since

We are part of the My Guide Network

My Guide Slovakia is part of the global My Guide Network of Online & Mobile travel guides. We are now in 180+ Destinations and Growing.

Nearby Destinations

Add to your trip

Add your travel dates so we can place this on the right day, or save it for later.